由于前期设计考虑不周全,现场的液下泵电机较低,有电机被淹没的可能,项目决定将凯士比液下泵增高一米,现场改造如下图:
Due to the inconsiderate design in the early stage, the motor of the submersible pump on site is relatively low, and the motor may be flooded. The project decided to increase the height of the submersible pump by one meter, and the on-site transformation is as follows:
改造前安装情况Installation condition before renovation
改造中Under reconstruction
改造中Under reconstruction
改造中Under reconstruction
改造中Under reconstruction
加高改造后安装图Installation drawing after elevation modification